Conference paper information

Solution of daily voltage constraints in the Spanish Electricity Market

E. Lobato, L. Rouco, T. Gómez, F.M. Echavarren, M.L. Navarrete Fernández, R. Casanova, G. López-Camino

14th Power Systems Computation Conference - PSCC 2002, Seville (Spain). 24-28 June 2002


Summary:
Voltage constraints in the Spanish electricity market are solved connecting a set of off-line generators. The start up cost internalized in the fixed income term of the generator bid plays a key role in the solution of voltage constraints since the coupled solution of voltage constraints for the 24 hourly scenarios is different from the individual solution of each hourly scenario. This paper presents an optimization approach to obtain the coupled solution of the daily voltage constraints in the Spanish electricity market. The input data of the problem consists of the individual solutions for each hourly scenario and the bus voltage sensitivities with respect to active and reactive injection of non-connected units. The system cost reduction of the proposed approach is illustrated using an actual example of the Spanish electricity market.


Keywords: power system dispatch, security assessment, congestion management.


Publication date: 2002-06-24.



Citation:
E. Lobato, L. Rouco, T. Gómez, F.M. Echavarren, M.L. Navarrete Fernández, R. Casanova, G. López-Camino, Solution of daily voltage constraints in the Spanish Electricity Market, 14th Power Systems Computation Conference - PSCC 2002, Seville (Spain). 24-28 June 2002.


    Research topics:
  • *Steady-state: Load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks